Arama
Oturum aç
Alıcı Arama
Gelişmiş Arama
İlanlarınızı dgMarket.com.tr sitesinde yayınlamak ister misiniz?
tıklayınız...

BD: Siddhirganj Power Project

Bu alıcı belirtilen kurumun bir üyesidir: Dünya Bankası(WB).
BD: Siddhirganj Power Project uygulanacağı yer: Bengaldeş.
This restructuring paper for the Siddhirganj Peaking Power Project for Bangladesh will increase the supply of electricity to the country's grid network. The primary development objective is to support investments in peaking power supply capability in Bangladesh such that unmet demand for energy is reduced by 1-billion kWh per year. Unmet demand has an economic cost of at as much as 2 percent of GDP. A secondary development objective is to build capacity among the implementing agencies: Electricity Generation Company of Bangladesh, Power Grid Company of Bangladesh, and Gas Transmission Company Limited (GTCL). Component A concerns the construction and Installation of a 335 MW combined cycle power plant (CCPP) in place of the construction and installation of a 300 MW peaking power station. Component B involves the construction and installation of a Siddhirganj 230kV AIS substation and the construction and installation of a Maniknagar 230kV GIS substation, in place of single contract for the construction and installation of Siddhirganj 230kV AIS and Maniknagar 230 kV GIS substations. The change in the project development objective is due to change of the power plant technology from peaking to an energy-efficient combined cycle that provides higher energy with lower gas consumption and meets base-load energy needs. It will deliver at least 2.49 billion kWh annually to the grid in place of at least 1 billion kWh. The new project development objective places the institutional strengthening element as part of intermediate results because a strengthened institution can use project assets efficiently to deliver the increased electricity to grid over long term.

İlan Ekle / Yayınla