Description Of The Heating Technology Construction Project The Building Property Is A Former Single-Family Home, That It Is To Be Converted Into An Additional Building For The Albert Von Reinach School. For This Purpose, The Heating Technology Will Be Completely Renewed. The Primary Heating Of The Building Is With Air/Water Heat Pump Provided. The Heat Is Transferred For Room Heating Via Static Radiators (New Installation), Sometimes With Ventilation Support. Central Drinking Hot Water Generation Is Not Planned And Is Therefore Not The Subject Of This Tender. Only Individual Electric Instantaneous Water Heaters Are Intended (Sanitary Engineering Trade) In Order To Reduce The Switching Frequency Of The Heat Pumps, A Buffer Storage Is Provided. The Building'S Piping Is Done With Stainless Steel Pipe. Notes On Timing: The Timing Will Be Announced Immediately When The Order Is Placed. Construction Is Currently Scheduled To Begin In April 2024
Sonuç İlanı
Sizlere güncel ve doğru bilgileri sunmak ilkemizdir. Ancak bilgilerin sıfır hata ile yayınlandığını garanti edemeyiz.
Bu ilana özel güncelleme, düzeltme veya önerileriniz için lütfen ilgili alıcıyla direkt temasa geçiniz.