Announcement From The Functional Area Of Industry And Energy Of The Government Delegation In Madrid, By Which The Modification Of The Request For Prior Administrative Authorization, Administrative Authorization For Construction And Declaration Of Public Utility For The Evacuation Infrastructure Line Of Construction Is Submitted To Public Information. 132 Kv Aerial Evacuation That Makes Entry And Exit To The Regata 132/30 Kv Substation Corresponding To The Regata Solar Pv Installation 57.12 Mwp / 50 Mw Installed, 30 Kv Evacuation Infrastructure That Connects Regata Solar Pv With The Regata Substation Set St Regata 132/30 Kv Transformer, (Input/Output At Regata 132/30 Kv Substation Of The 132 Kv Recova-Morata Line), In The Province Of Madrid. Exp.: Pfot-260. (EXPIRED)