• Installation Of A Temporary Water Supply Network Hanging From The Facades To Maintain The Service During The Execution Of The Works. • Demolition Of The Current Pavement And Demolition Of The Current Water Network And Brooms. • Demolition Of The Current Road Composed Of An Asphalt Bearing Layer And A Concrete Base. • Excavation Of A Trench In The Land To The Depth Established In The Measurements And In The Regulations To Install The New Supply Network. • Installation Of The New Polyethylene Pipe For Water Supply, Sprinklers In The Homes, Watering Cans And Hydrants. • Installation Of The New Polyethylene Water Supply Pipe • Installation Of The New Rainwater Collection Pipe. • Installation Of The New Sewage Collection Pipe. • Paving Of The Square. • Cleaning, Disinfection And Certification Of Temporary And Final Water Pipes By An Approved Company.
Teklif Çağrısı
Sizlere güncel ve doğru bilgileri sunmak ilkemizdir. Ancak bilgilerin sıfır hata ile yayınlandığını garanti edemeyiz.
Bu ilana özel güncelleme, düzeltme veya önerileriniz için lütfen ilgili alıcıyla direkt temasa geçiniz.