Selection of Design Consultant to Prepare Preliminary Design and Tender Document for Construction of New 150kV/20kV Substation at Seloi to Improve the Reliability of Supplying Power to Aileu and Ermera. (EXPIRED)

Teklif Çağrısı

GENEL BİLGİ

Doğu Timor
   Aileu & Ermera
   RFP/00208/EDTL-EP-2022
   19 Ekim, 2022
18 Kasım, 2022
Eletricidade de Timor-Leste Empresa Publica (EDTL-EP)
   A firm will be selected under the Quality and Cost-Based Selection (QCBS) with modification Technical and Price weight of (80:20) as described in the RFP document. The technical proposal will be evaluated based on the Qualification of the Firms (The Consultant has successfully completed at least 2 similar projects (similarity in terms of complexity, magnitude and nature) with a minimum value of each contract is US$ 150,000.00 over the past 10 years as a Single Entity or Joint Venture Partner), Approach & Methodology and Experts CV. The minimum technical score (St) required to pass is: 75%
   İngilizce
   Uluslararası tedarik
   yayınlandı: 19 Ekim, 2022

İletişim Bilgileri

   Fransisco Martins
Procurement Specialist
Eletricidade de Timor-Leste Empresa Publica
Dili Timor Leste
Dili, Dili
Doğu Timor
   +67077298858
   tıklayınız...
   www.edtl-ep.com

ÜRÜNLER, İŞLER ve HİZMETLER

Additional resources

Orjinal Metni

Bu ilan sadece bilgi içindir.
Sizlere güncel ve doğru bilgileri sunmak ilkemizdir. Ancak bilgilerin sıfır hata ile yayınlandığını garanti edemeyiz.
Bu ilana özel güncelleme, düzeltme veya önerileriniz için lütfen ilgili alıcıyla direkt temasa geçiniz.