- Lot No. 1 Choosing A General Contractor To Carry Out Design Work On The Facility: “Modernization Of The Air Conditioning System In The Building Of The“ Lesnoy ”State Institution“ Youth Sanatorium ”, Located At The Address: Minsk District, Zhdanovichsky S/S, 67/1, P/O Ratoka”;- Lot No. 2 Choosing Of Design Work On The Facility: “Modernization Of The Conditioning System Air In The Corps Of The "Marine" State Institution "Sanatorium" Youth ", Located At: Minsk District, Zhdanovichsky S/S, 67/1, P/O Ratatka"; - Lot No. 3 The Choice Of The General Contractor To Perform Design Work On The Facility: “Modernization Of The Air Conditioning System In The Corps Of The“ Medical Diagnostic ”Building Of The State Institution“ Youth Sanatorium ”, Located At The Address: Minsk District, Zhdanovichi S/S, 67/2, N/A Rangka”.
Sonuç İlanı
Sizlere güncel ve doğru bilgileri sunmak ilkemizdir. Ancak bilgilerin sıfır hata ile yayınlandığını garanti edemeyiz.
Bu ilana özel güncelleme, düzeltme veya önerileriniz için lütfen ilgili alıcıyla direkt temasa geçiniz.