Arama

Master Plan for the Angolan Electrical System (EXPIRED)

Niyet Başvurusu Talebi

GENEL BİLGİ

Angola
   Luanda
   AO-MINEA - GEPE-297806-CS-QCBS
   29 Ağustos, 2022
26 Eylül, 2022
  
ANGOLA - MINISTRY OF ENERGY AND WATER (MINEA)
   The consulting firm must have at least ten (10) years of experience in power system engineering and economics, and must have experience in the operation of complex power systems involving large sized plants operating on Hydro, HFO, LFO and LNG, and intermittent renewable energy (in particular, wind and solar).
   İngilizce
   Uluslararası tedarik
   yayınlandı: 29 Ağustos, 2022

İletişim Bilgileri

   Joao Saraiva
Electricity Sector Improvement and Access Project
Project Coordination Unit. Condomínio Astros, Predio Aquario, Apto 120-D
Rua do MAT. Talatona
Luanda
Angola
   +244947913331
   tıklayınız...

Görevler

Kamu yararına hizmet ve tesisler Mühendislikle bağlantılı bilimsel ve teknik hizmetler

Additional resources

Orjinal Metni

Bu ilan sadece bilgi içindir.
Sizlere güncel ve doğru bilgileri sunmak ilkemizdir. Ancak bilgilerin sıfır hata ile yayınlandığını garanti edemeyiz.
Bu ilana özel güncelleme, düzeltme veya önerileriniz için lütfen ilgili alıcıyla direkt temasa geçiniz.